Correct answer: A. Do not launch the planned operation until an adequate mitigation or redesign exists.
Missing essential ground controls are a reason to redesign or cancel, not to accept schedule pressure.
Drone exam · Ground-risk mitigation
Correct answer: A. Do not launch the planned operation until an adequate mitigation or redesign exists.
Missing essential ground controls are a reason to redesign or cancel, not to accept schedule pressure.