Answer
The operator should define the intended flight geography, a contingency volume for foreseeable deviations, and the required ground risk buffer or equivalent protective area under the applicable authorisation method.
Explanation
A route line does not describe where the aircraft may go during abnormal but recoverable behavior or where a failure may affect the ground.