Answer
Update the site assessment using the conditions actually present, identify how each hazard affects the route and recovery options, and change or cancel the operation if the risks cannot be controlled.
Explanation
Remote planning cannot capture every temporary or local hazard. The site survey is where the pilot tests the plan against reality.